Permit Applications Received

The following is a list of open permit applications for notices of construction received by the Southest Clean Air Agency. Facilities include:

Little Hanaford Farms L-604
Hampton Lumber - Randle Mill L-607
Chiltworth Pacific Fire Laboratories, Inc. CO-844
Imperial Fabricating L-612
Chinook Ventures, Inc. - Flat Storage CO-845
Pacific Rock Products, LLC CL-1815
Chehalis Lam, Inc. L-625
Pacific Power and Light/Merwin CL-1849
Stirling Auto Body CO-864
Pacific Nutritional, Inc. CL-1876
Sierra Pacific Industries Title V Permit Application Notice
Hambleton Lumber Sales, LLC CL-1896
Mint Farm Generating Station – Puget Sound Energy CO-888
WaferTech CL-1901
United Harvest, LLC CO-889
Kalama Export CO-891
Safeway Store #1762 CO-892
Camas School District #117 – Hayes Freedom High School CL-1905
Oregon Iron Works CL-1885
Pacific Rock Products – Lewisville Pit CL-1904
Foster Poultry Farms – Kelso Plant CO-893
Thompson Metal Fab, Inc. CL-1906
Puget Sound Energy L-640
Old Friends Custom Finishing CL-1908
Fred Meyers Fuel Stop #208 Mill Plain CL-1907

Application Number L-604
Affected Facility

Little Hanaford Farms
2385 Little Hanaford Road
Centralia, Washington 98531

Description of Facility
Compost production
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for operation of a leachate collection and treatment system at the applicant's existing composting facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: VOC, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

August 20, 2007
August 22, 2007


September 6, 2007

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number L-607
Affected Facility

Hampton Lumber - Randle Mill
10166 US Highway 12
Randle, WA

Description of Facility
Lumber Mill
Source Designation

Title V
The facility is a stationary source subject to the Operating Permit Program contained in Chapter 173-401 WAC. Facility emissions are greater than 100 tpy of any single criteria pollutant, greater than 10 tpy of any single hazardous air pollutant, and/or greater than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to modify certain aspects of their existing permit including monitoring requirements and emission averaging at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, PM10, NOx, SO2, CO, VOC
Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

September 18, 2007
October 3, 2007

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 29
E-mail:

View PDF version of notice

Application Number CO-844
Affected Facility

Chiltworth Pacific Fire Laboratories, Inc.
2401 B Talley Way
Kelso, WA 98626

Description of Facility
Chiltworth Pacific performs burning of materials in a laboratory test hood to gather information for modeling, litigation support, basic fire search and standards testing of materials.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of the existing facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: NOX, CO, PM, VOC, SO2, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

September 10, 2007
November 15, 2007

December 3, 2007

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number L-612
Affected Facility

Imperial Fabricating
206 Maurin Road
Chehalis, WA 98532

Description of Facility
Imperial Fabricating fabricates and assembles components for heavy truck and bus industries including aluminum and steel fuel tanks, frame cross members, gussets, battery boxes and various stamped and welded assemblies.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of the existing facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

November 13, 2007
November 15, 2007

December 3, 2007

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number CO-845
Affected Facility

Chinook Ventures, Inc. - Flat Storage
4029 Industrial Way
Longview, WA 98632

Description of Facility
Chinook Ventures is renovating the site of a former primary aluminum smelter (Reynolds) in Longview, Washington. Rehabilitation projects are focused on converting the site into a mixed use, industrial park.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a proposal to reconfigure former production buildings (Buildings #51-#56) for use in storing and handling bulk commodities. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

October 29, 2007
November 26, 2007

December 11, 2007

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1815
Affected Facility

Pacific Rock Products, LLC
Portable #1 - Fisher Quarry
19201 SE 34th Street
Camas, WA 98607

Description of Facility
Portable rock crushing operation.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new rock crushers and aggregate screens at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter (PM)
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

December 10, 2007
January 16, 2008

January 31, 2008

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number L-625
Affected Facility

Chehalis Lam, Inc.
195 Ribelin Rd.
Chehalis, WA 98532

Description of Facility
Chehalis Lam manufactures laminated wood structural beams
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for an increase in production limits at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of Particulate Matter and Volatile Organic Compounds
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

June 30, 2008
July 1, 2008

July 16, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1849
Affected Facility

Pacific Power and Light/Merwin
105 Merwin Village Ct.
Ariel, WA 98603

Description of Facility
Hydroelectric power generation facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of an emergency backup generator for use in powering spillway gates in the event of a power failure at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Particulate Matter, Volatile Organic Compounds, and Sulfur Dioxide
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

September 16, 2008
September 18, 2008

October 3, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CO-864
Affected Facility

Stirling Auto Body
1151 Vandercook Way
Longview, WA 98632

Description of Facility
Automotive repair and painting facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application installation and operation of a paint booth and associated activities at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Volatile Organic Compounds, and Toxic and/or Hazardous Air Pollutants

Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

November 4, 2008
November 20, 2008

December 5, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1876
Affected Facility

Pacific Nutritional, Inc.
6317 NE 131st St.
Vancouver, WA 98682

Description of Facility
This facility blend food chemicals and manufactures packages of vitamins.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for relocation of the facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, and Particulate Matter

Public Comment Period

A thirty (30) day public comment period will be provided upon written request for this application/permit pursuant to SWCAA 400-171(3).

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(1)(b). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

April 6, 2009
April 16, 2009

May 1, 2009

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Notice Prepared September 3, 2009
Applicant

The following applicant has submitted an Air Operating Permit (AOP) application to the Southwest Clean Air Agency (SWCAA):

Sierra Pacific Industries, Inc. – Centralia Sawmill
3115 Kuper Road
Centralia, WA 98531

Action
SWCAA has received the Air Discharge Permit application July 14, 2009
Facility Description

Sierra Pacific Industries has a sawmill located at 3115 Kuper Road, Centralia, Lewis County, Washington. Sierra Pacific Industries is a manufacturer of finished lumber products. The sawmill receives fresh cut Douglas fir and hemlock timber, and processes the wood into finished lumber. The finished lumber is predominantly used for construction. Dimensional lumber produced at Sierra Pacific is shipped both kiln dried and green.  The green lumber is treated with anti-stain. The sawmill equipment includes a Nebraska hog fuel boiler, dry kilns, sawing facility, bunkers, a planer, and a baghouse. The sawmill normally operates 2 shifts, 8 hours per day, 5 days per week but has the potential to work 3 shifts. 

Pollutant Discharge
Estimated emissions of criteria and hazardous air pollutants (HAPs) to the ambient air for the year 2008 are as follows:
Pollutant

Actual Emissions (tons per year)

VOC
51.51 tpy
NOx
15.69 tpy
CO
21.15 tpy
PM
35.88 tpy
PM10
31.33 tpy
PM2.5
17.73 tpy
SO2
8.93 tpy
HAP
15.05 tpy
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, PM10
Project Impact This action does not change existing permit limits already established in federally enforceable Air Discharge Permits. 
Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 29
E-mail:

View PDF version of notice

Application Number CL-1896
Affected Facility

Hambleton Lumber Sales, LLC
520 South 28th Street
Washougal, WA 98671

Description of Facility Lumber Mill
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of three existing dry kilns.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: CO, VOC, PM, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

November 2, 2009
November 10, 2009

November 25, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-888
Affected Facility

Mint Farm Generating Station – Puget Sound Energy
1200 Prudential Blvd.
Longview, WA  98632

Description of Facility
The Mint Farm Generating Station is a primary power generation facility located in Longview, Washington.  The facility is fully owned by Puget Sound Energy.
Source Designation

Operating Permit Program (Title V)
Facility emissions will be less than the applicability thresholds for Title V (100 tpy of any single criteria pollutant, greater than 10 tpy of any single hazardous air pollutant, and/or greater than 25 tpy of any combination of hazardous air pollutants).  However, the facility is subject to the Operating Permit Program contained in Chapter 173-401 WAC because the facility includes a utility unit subject to the Acid Rain Program under Title IV of the Federal Clean Air Act.

Purpose of Application
SWCAA has received a permit application for modification of the existing Air Discharge Permit for the above described facility.  The requested modification will remove obsolete emission units, revise startup/shutdown conditions, and clarify measures taken to minimize NOX emissions.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, PM, VOC, SO2, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

October 29, 2009
November 23, 2009

December 8, 2009

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1901
Affected Facility

WaferTech
5509 NW Parker Street,
Camas, WA

Description of Facility
Semiconductor Manufacturing Facility
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place.  Facility emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants. 

Purpose of Application
SWCAA has received a permit application for installation of an epitaxial reactor which will exhaust to an existing relocated scrubber and modification of existing emission testing and reporting requirements at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

December 23, 2009
December 31, 2009

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number CO-889
Affected Facility

United Harvest, LLC
400 Toteff Road
Kalama, WA 98625

Description of Facility Grain terminal
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
United Harvest has submitted a permit application requesting an increase in the permitted emission limits for the facility to accommodate increased business activity.  In addition, the application requests that the emission calculation methodology be updated.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

December 31, 2009
January 6, 2010

January 21, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-891
Affected Facility

Kalama Export
2211 N Hendrickson Rd.
Kalama, WA 98625

Description of Facility
Grain Export Facility
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place. Facility emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new storage bins and associated conveyors and baghouses at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter

Public Comment Period

A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.

Opportunity for Public Involvement

Any person who wishes to review or comment on this application may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

January 6, 2010
January 13, 2010

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CO-892
Affected Facility

Safeway Store #1762
1725 Pacific Avenue
Woodland, WA 98674

Description of Facility Gas Station
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to replace Stage I vapor control equipment at a retail gasoline dispensing facility equipped with Stage I and Stage II vapor recovery systems.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: VOC, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

January 19, 2010
January 27, 2010

February 11, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CL-1905
Affected Facility

Camas School District #117 – Hayes Freedom High School
1919 NE Ione Street
Camas, WA 98607

Description of Facility School
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of one new natural gas-fired boiler and two water heaters at the new school.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: CO, NOX, VOC, PM, SOX, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

February 2, 2010
February 4, 2010

February 19, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CL-1885
Affected Facility

Oregon Iron Works
3515 S.E. Columbia Way &
2625 SE Hidden Way
Vancouver, WA 98661

Description of Facility Steel construction and painting
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a new blast booth, new paint booth, and expanded outdoor operations.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: CO, NOX, VOC, PM, SO2, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage under the "Permits and Appeals/Open for Public Comment" section (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

June 19, 2009
February 4, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CL-1904
Affected Facility

Pacific Rock Products – Lewisville Pit
25902 NE 109th Ave.
Battleground, WA 98604

Description of Facility Rock crushing facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of rock crusher..  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

February 1, 2010
February 9, 2010

February 24, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-893
Affected Facility

Foster Poultry Farms – Kelso Plant
1700 South 13th Avenue
Kelso, WA 98626

Description of Facility Poultry processing plant
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to derate existing boilers to address the potential for excess emissions at higher load levels.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: VOC, CO, NOX, PM, SO2, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

February 1, 2010
February 9, 2010

February 24, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CL-1906
Affected Facility

Thompson Metal Fab, Inc.
3000 SE Hidden Way
Vancouver, WA  98661

Description of Facility
Thompson Metal Fab, Inc. is a metal fabrication and spray coating company that specializes in large structural steel projects.
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place.  Facilitywide emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for renewal of authorization to conduct temporary outdoor surface prep and spray coating operations at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, PM, VOC, SO2, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

February 2, 2010
February 18, 2010

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number L-640
Affected Facility

Puget Sound Energy
239 Zandecki Road
Chehalis, WA 98532

Description of Facility
Puget Sound Energy operates a natural gas transfer and storage facility on Zandecki Road in Chehalis known as the Jackson Prairie Storage Operations. 
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place.  Facility emissions are limited to less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants. 

Purpose of Application
SWCAA has received a permit application for modification of the catalyst temperature rise requirement on three units at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: No increase in emission limits associated with this action

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

During the 30-day public comment period, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

March 1, 2010
March 4, 2010

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number CL-1908
Affected Facility

Old Friends Custom Finishing
3315 NE 112th Avenue
Vancouver, WA 98682

Description of Facility
Old Friends Custom Finishing operates a furniture stripping and refinishing facility.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for relocation of the facility from its former location at 7215-B NE 18th Street in Vancouver at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: NOx, CO, PM, VOC, SO2, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  •  Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below.

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

March 1, 2010
March 4, 2010

March 19, 2010

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number CL-1907
Affected Facility

Fred Meyers Fuel Stop #208 Mill Plain
11325 SE Mill Plain Boulevard
Vancouver, WA 98684

Description of Facility Gas Station
Source Designation

Minor
The facility will be a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application build a new retail gasoline dispensing facility equipped with Stage I and Stage II vapor recovery systems.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action has the potential to impact emissions of the following pollutants: VOC, HAPs, TAPs

Public Comment Period No public comment period for the draft permit is currently scheduled. A 30-day public comment period for the draft permit may be provided upon written request pursuant to SWCAA 400-107(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;

If a public comment period was requested and granted, any person may:

  • Provide comment on the draft permit.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

March 2, 2010
March 4, 2010

March 19, 2010

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

 

If you wish to be informed on a current permit application, multiple permit applications and/or all activities of a source, you may sign up and become an interested party. As an interested party, we will keep you informed via e-mail or postal mail services (as indicated by you) on all activities you chose to be informed on. Click here to sign up to become an interested party.

Home | About the Agency | Agency News | Reports & Studies | Current Air Quality | Outdoor Burning | Woodstoves | Agricultural Burning | Permits & Appeals
Forms & Applications | Business Assistance | Regulations | Asbestos | Lead | Filing a Complaint | Public Outreach | Important Links | Search
© Copyright 2010, Southwest Clean Air Agency. All rights reserved.