Permit Applications Received

The following is a list of open permit applications for notices of construction received by the Southest Clean Air Agency. Facilities include:

Chinook Ventures, Inc. CO-839
Little Hanaford Farms L-604
Hampton Lumber - Randle Mill L-607
Chiltworth Pacific Fire Laboratories, Inc. CO-844
Imperial Fabricating L-612
Chinook Ventures, Inc. - Flat Storage CO-845
Pacific Rock Products, LLC CL-1815
Exterior Wood CL-1825
Chehalis Lam, Inc. L-625
Pacific Power and Light/Merwin CL-1849
Turner Engineering and Manufacturing Co. CL-1850
Max Auto Body CO-867
Stirling Auto Body CO-864
Cameron Family Glass Packaging, LLC CO-868
Attbar, Inc. CL-1860
Fabrication Products, Inc. CL-1863
Weyerhaeuser Hardwoods - Centralia L-631
Washington State University Vancouver - CL-1864
Weyerhaeuser Hardwoods and Industrial Products CO-873
Chinook Ventures, Inc. – Flat Storage CO-875
DeWils Industries, Inc. CL-1873
EGT Development, LLC CO-876
Pacific Nutritional, Inc. CL-1876
Berry Plastics Corporation CL-1881
Cynthia Ouellette CO-879
Emerald Kalama Chemical, LLC CO-878
Oregon Iron Works CL-1885
Konell Construction and Demolition – Wood Grinder CO-881

Application Number CO-839
Affected Facility

Chinook Ventures, Inc.
4029 Industrial Way
Longview, WA 98632

Description of Facility
Chinook Ventures operates a former primary aluminum smelter (Reynolds) in Longview, Washington as a mixed use, industrial park. The current proposal will reactivate bulk material handling and storage equipment previously used to handle petroleum coke and other carbon products at the facility (Carbon Plant).
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for review and approval of an existing bulk material handling operation at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

July 11, 2007
August 7, 2007

August 22, 2007

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number L-604
Affected Facility

Little Hanaford Farms
2385 Little Hanaford Road
Centralia, Washington 98531

Description of Facility
Compost production
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for operation of a leachate collection and treatment system at the applicant's existing composting facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: VOC, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

August 20, 2007
August 22, 2007


September 6, 2007

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number L-607
Affected Facility

Hampton Lumber - Randle Mill
10166 US Highway 12
Randle, WA

Description of Facility
Lumber Mill
Source Designation

Title V
The facility is a stationary source subject to the Operating Permit Program contained in Chapter 173-401 WAC. Facility emissions are greater than 100 tpy of any single criteria pollutant, greater than 10 tpy of any single hazardous air pollutant, and/or greater than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to modify certain aspects of their existing permit including monitoring requirements and emission averaging at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, PM10, NOx, SO2, CO, VOC
Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

September 18, 2007
October 3, 2007

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 29
E-mail:

View PDF version of notice

Application Number CO-844
Affected Facility

Chiltworth Pacific Fire Laboratories, Inc.
2401 B Talley Way
Kelso, WA 98626

Description of Facility
Chiltworth Pacific performs burning of materials in a laboratory test hood to gather information for modeling, litigation support, basic fire search and standards testing of materials.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of the existing facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: NOX, CO, PM, VOC, SO2, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

September 10, 2007
November 15, 2007

December 3, 2007

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number L-612
Affected Facility

Imperial Fabricating
206 Maurin Road
Chehalis, WA 98532

Description of Facility
Imperial Fabricating fabricates and assembles components for heavy truck and bus industries including aluminum and steel fuel tanks, frame cross members, gussets, battery boxes and various stamped and welded assemblies.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval of the existing facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, HAPs, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

November 13, 2007
November 15, 2007

December 3, 2007

Agency Contact Person

Natalia Kreitzer
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 14
E-mail:

View PDF version of notice

Application Number CO-845
Affected Facility

Chinook Ventures, Inc. - Flat Storage
4029 Industrial Way
Longview, WA 98632

Description of Facility
Chinook Ventures is renovating the site of a former primary aluminum smelter (Reynolds) in Longview, Washington. Rehabilitation projects are focused on converting the site into a mixed use, industrial park.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a proposal to reconfigure former production buildings (Buildings #51-#56) for use in storing and handling bulk commodities. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: PM, TAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

October 29, 2007
November 26, 2007

December 11, 2007

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1815
Affected Facility

Pacific Rock Products, LLC
Portable #1 - Fisher Quarry
19201 SE 34th Street
Camas, WA 98607

Description of Facility
Portable rock crushing operation.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new rock crushers and aggregate screens at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter (PM)
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

December 10, 2007
January 16, 2008

January 31, 2008

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1825
Affected Facility

Exterior Wood
2684 Index Street
Washougal, WA

Description of Facility
Lumber Mill
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to update dry kiln emission factors and emission limit at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: VOC, PM, PM10, TAPs, HAPs
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

February 28, 2008
March 24, 2008


April 8, 2008

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 29
E-mail:

View PDF version of notice

Application Number L-625
Affected Facility

Chehalis Lam, Inc.
195 Ribelin Rd.
Chehalis, WA 98532

Description of Facility
Chehalis Lam manufactures laminated wood structural beams
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for an increase in production limits at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of Particulate Matter and Volatile Organic Compounds
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

June 30, 2008
July 1, 2008

July 16, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1849
Affected Facility

Pacific Power and Light/Merwin
105 Merwin Village Ct.
Ariel, WA 98603

Description of Facility
Hydroelectric power generation facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of an emergency backup generator for use in powering spillway gates in the event of a power failure at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Particulate Matter, Volatile Organic Compounds, and Sulfur Dioxide
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

September 16, 2008
September 18, 2008

October 3, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1850
Affected Facility

Turner Engineering and Manufacturing Co.
3001 SE Columbia Way
Vancouver, WA 98661

Description of Facility
The facility is a heavy steel fabrication facility specializing in sawmill and mining equipment.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for initial permitting action for establishment of a heavy steel fabrication facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter, Volatile Organic Compounds, and Toxic/Hazardous Air Pollutants
Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

September 25, 2008
October 6, 2008

October 21, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CO-867
Affected Facility

Max Auto Body
1164 11th Avenue
Longview, WA 98632

Description of Facility
Auto Body Repair
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for operation of an existing paint spray booth.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

November 6, 2008
November 17, 2008

December 2, 2008

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-864
Affected Facility

Stirling Auto Body
1151 Vandercook Way
Longview, WA 98632

Description of Facility
Automotive repair and painting facility
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application installation and operation of a paint booth and associated activities at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Volatile Organic Compounds, and Toxic and/or Hazardous Air Pollutants

Public Comment Period A thirty (30) day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period on draft permit:

November 4, 2008
November 20, 2008

December 5, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CO-868
Affected Facility

Cameron Family Glass Packaging, LLC CO-868
2310 N. Hendrickson Drive
Kalama, WA 98625

Description of Facility
Glass bottle manufacturing
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of new material handling equipment.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

November 20, 2008
December 1, 2008

December 16, 2008

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CL-1860
Affected Facility

Attbar, Inc.
5985 S 6th Way
Ridgefield, WA 98642

Description of Facility
This facility is a manufacturer of fiberglass reinforced products (mainly for the trucking industry) and small personal watercraft.
Source Designation

Title V
The facility is a stationary source subject to the Operating Permit Program contained in Chapter 173-401 WAC. Facility potential emission are greater than 100 tpy of any single criteria pollutant, greater than 10 tpy of any single hazardous air pollutant, and/or greater than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation and operation of a paint booth at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter, Volatile Organic Compounds, and Toxic/Hazardous Air Pollutants

Public Comment Period

A thirty (30) day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage  in the "Permits & Appeals" section (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

November 19, 2008
December 10, 2008

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1863
Affected Facility

Fabrication Products, Inc.
4201 NE Minnehaha Street
Vancouver, WA 98661

Description of Facility Fabrication of metal parts
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for operation installation of a new cartridge-style dust collector to control particulate matter emissions from plasma cutting.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

December 26, 2008
December 30, 2008

January 14, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number L-631
Affected Facility

Weyerhaeuser Hardwoods - Centralia
3000 Galvin Road
Centralia, WA  98531

Description of Facility
Weyerhaeuser Hardwoods operates a green timber sawmill in Centralia, Washington.  The sawmill receives raw hardwood timber and processes the wood into lumber.  A significant portion of the lumber processed in the mill is dried in onsite lumber kilns.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for approval to dry hemlock lumber at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

December 26, 2008
January 13, 2009

January 28, 2009

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1864
Affected Facility

Washington State University (Vancouver)
14204 Salmon Creek Ave
Vancouver, WA 98686

Description of Facility
Washington State University (Vancouver) is a campus of the Washington State University system
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions will be/are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for installation of hot water heaters and boilers at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, Particulate Matter, Volatile Organic Compounds, Sulfur Dioxide

Public Comment Period

A thirty (30) day public comment period will be provided upon written request for this application/permit pursuant to SWCAA 400-171(3).

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(1)(b). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

January 6, 2009
January 13, 2009

January 28, 2009

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CO-873
Affected Facility

Weyerhaeuser Hardwoods and Industrial Products
120 Industrial Way
Longview, Washington

Description of Facility Lumber mill with dry kilns
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to process 20 million board feet of Western Hemlock at the existing facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, VOC, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

February 17, 2009
February 25, 2009

March 12, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-875
Affected Facility

Chinook Ventures, Inc. – Flat Storage
4029 Industrial Way
Longview, WA 98632

Description of Facility
Chinook Ventures is a mixed use, heavy industrial park located at the site of a former primary aluminum smelter (Reynolds) in Longview, Washington.  The facility affected by this permitting action is an outdoor bulk storage and handling operation.  As proposed, the operation will process only coal and petroleum coke.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for the installation of a railcar receiving pit, shiploading equipment, outdoor storage areas, and associated conveyance equipment.  The proposed equipment will be used to store and handle bulk quantities of coal and petroleum coke.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

March 5, 2009
March 24, 2009

April 8, 2009

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CL-1873
Affected Facility

DeWils Industries, Inc.
6307 NE 127th Ave.
Vancouver, Washington 98682

Description of Facility
The affected facility manufactures finished cabinetry products and accessories from raw, dried lumber.  Facility processes include woodworking, spray coating, hand staining, and warehouse operations.
Source Designation

Title V Opt-Out
This facility is a stationary source that would potentially be subject to the Operating Permit Program if a federally enforceable emission limit was not in place.  Facility emissions will not exceed 100 tpy of any single criteria pollutant, 10 tpy of any single hazardous air pollutant, or 25 tpy of any combination of hazardous air pollutants. 

Purpose of Application
SWCAA has received a permit application for modification of existing regulatory restrictions to allow the use of coatings containing chromium II/III compounds at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: HAPs, TAPs

Public Comment Period A 30 day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3).  When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA permit webpage (www.swcleanair.org/permitsprelim.html).  A notice announcing the draft permit will be published in a local newspaper.
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

March 19, 2009
March 25, 2009

Agency Contact Person

Wess Safford
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 26
E-mail:

View PDF version of notice

Application Number CO-876
Affected Facility

EGT Development, LLC
Port of Longview, Berth 9
Longview, WA 98632

Description of Facility
This facility handles a variety of grains for export
Source Designation

Title V Opt-Out
This facility is a stationary source that would be subject to the Operating Permit Program if a federally enforceable emission limit was not in place. Facility emissions will be limited to less than 100 tpy of any single criteria pollutant (including particulate matter), less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for modification of emission units at the above described facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter

Public Comment Period

A thirty (30) day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage  in the "Permits & Appeals" section (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

April 7, 2009
April 16, 2009

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1876
Affected Facility

Pacific Nutritional, Inc.
6317 NE 131st St.
Vancouver, WA 98682

Description of Facility
This facility blend food chemicals and manufactures packages of vitamins.
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110. Facility emissions are less than 100 tons per year (tpy) of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for relocation of the facility. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Nitrogen Oxides, Carbon Monoxide, and Particulate Matter

Public Comment Period

A thirty (30) day public comment period will be provided upon written request for this application/permit pursuant to SWCAA 400-171(3).

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(1)(b). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

April 6, 2009
April 16, 2009

May 1, 2009

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1881
Affected Facility

Berry Plastics Corporation
3807 SE Hidden Way
Vancouver, WA 98661

Description of Facility
Plastic extrusion
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions are less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to modify emission factors at the above described facility.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants
The proposed permitting action is expected to impact emissions of the following pollutants: VOC
Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3). Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for requesting a public comment period or draft permit:

May 7, 2009
May 12, 2009


May 27, 2009

Agency Contact Person

Vannessa McClelland
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 29
E-mail:

View PDF version of notice

Application Number CO-879
Affected Facility

Cynthia Ouellette
1335 14th Avenue
Longview, WA 98632

Description of Facility Coffee Roasting
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for a new coffee roasting facility utilizing a catalytic oxidizer to control emissions and odor.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: CO, NOX, PM, SO2, VOC, odor

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

May 22, 2009
May 26, 2009

June 10, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-878
Affected Facility

Emerald Kalama Chemical, LLC
1296 3rd St.
Kalama, WA 98625

Description of Facility
This facility is a synthetic organic chemical manufacturer of specialty and fine chemicals, including chemicals for wood products, flavor, fragrance, food, beverage, paint, pharmaceutical, and photographic industries.
Source Designation

Title V
The facility is a stationary source subject to the Operating Permit Program contained in Chapter 173-401 WAC. Facility emissions of criteria pollutants (nitrogen oxides and carbon monoxide) are greater than 100 tpy.

Title V Opt-out
This facility is a stationary source that would be subject to the Operating Permit Program for Hazardous Air Pollutants (HAPs) if a federally enforceable emission limit was not in place. Facility emissions of HAP are limited to less than 10 tpy of any single HAP, and less than 25 tpy of any combination of HAPs. 

Purpose of Application
SWCAA has received a permit application for an administrative amendment to ADP 07-2759 to correct discrepancies in operating procedures and other errata. The application has not yet been reviewed to determine if it is administratively complete. The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information. A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: Particulate Matter, Volatile Organic Compounds, and Toxic/Hazardous Air Pollutants

Public Comment Period

A thirty (30) day public comment period will be provided for this application/permit pursuant to SWCAA 400-171(3). When complete, a copy of the draft permit will be made available at the SWCAA business office and posted on the SWCAA webpage  in the "Permits & Appeals" section (www.swcleanair.org/permitsprelim.html). A notice announcing the draft permit will be published in a local newspaper.

Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a copy of the draft permit via regular or electronic mail when available. Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided. Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit. Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted. A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:

May 21, 2009
June 16, 2009

Agency Contact Person

John St.Clair
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 27
E-mail:

View PDF version of notice

Application Number CL-1885
Affected Facility

Oregon Iron Works
3515 S.E. Columbia Way, Bld. #48
Vancouver, WA 98661

Description of Facility Steel construction and painting
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application to temporarily operate a diesel-fired generator set to support current operations until utility power can be installed.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: PM, VOC, NOX, CO, SO2, HAP, TAP

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

June 19, 2009
June 25, 2009

July 10, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

Application Number CO-881
Affected Facility

Konell Construction and Demolition – Wood Grinder
Portable – to be determined

Description of Facility Portable wood grinder
Source Designation

Minor
The facility is a stationary source subject to review under SWCAA 400-110.  Facility emissions will be less than 100 tpy of any single criteria pollutant, less than 10 tpy of any single hazardous air pollutant, and less than 25 tpy of any combination of hazardous air pollutants.

Purpose of Application
SWCAA has received a permit application for operation of a portable wood grinding plant driven by a diesel engine.  The application has not yet been reviewed to determine if it is administratively complete.  The SWCAA permit writer identified below will be reviewing the application to make a determination of completeness and, if necessary, make a request for additional information.  A copy of the application will be available to the public when the application is determined to be complete.
Affected Pollutants

The proposed permitting action is expected to impact emissions of the following pollutants: VOCs, NOX, CO, PM, SO2

Public Comment Period A 30 day public comment period will be provided upon request for this application/permit pursuant to SWCAA 400-171(3).
Opportunity for Public Involvement

Any person who wishes to review or comment on this application/permit may:

  • Contact the agency contact person identified below for more information;
  • Request a public comment period pursuant to SWCAA 400-171(3).  Requests for a public comment period must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Request a copy of the draft permit via regular or electronic mail when available.  Requests for a copy of the draft permit must be submitted to SWCAA in writing via letter, fax, or electronic mail no later than the date specified below;
  • Provide comment on the draft permit if a public comment period is provided.  Comments must be submitted to SWCAA in writing prior to the end of the designated public comment period; or
  • Request a public hearing for the draft permit.  Public hearing requests must be received by SWCAA in writing during the designated public comment period, indicate the interest of the person filing the request, and state why a hearing is warranted.  A public hearing will be held if the Control Officer determines that significant public interest exists.
Application Dates
Date received:
Date of public notice:
Due date for public comment period and draft permit requests:

June 18, 2009
June 29, 2009

July 14, 2009

Agency Contact Person

Clint Lamoreaux
AQ Engineer

View Word version of notice

Phone: 360-574-3058, ext. 31
E-mail:

View PDF version of notice

 

If you wish to be informed on a current permit application, multiple permit applications and/or all activities of a source, you may sign up and become an interested party. As an interested party, we will keep you informed via e-mail or postal mail services (as indicated by you) on all activities you chose to be informed on. Click here to sign up to become an interested party.

Home | About the Agency | Agency News | Reports & Studies | Current Air Quality | Outdoor Burning | Woodstoves | Agricultural Burning | Permits & Appeals
Forms & Applications | Business Assistance | Regulations | Asbestos | Lead | Filing a Complaint | Public Outreach | Important Links | Search
© Copyright 2008, Southwest Clean Air Agency. All rights reserved.